Hot water system installation checklist
Use your browser's Print to print it or save it as a PDF. Back to the template
System type
- Electric storage
- Gas storage
- Continuous flow gas
- Heat pump
- Solar
- Other
New unit, make, model and serial
Unit replaced, make and model
Where it is installed
Valves and fittings
- Temperature and pressure relief valve fitted, with its drain line run
- Tempering or mixing valve fitted, where needed
- Isolation valve fitted
- Expansion control valve fitted, where needed
- Non-return valve fitted, where needed
Hot water temperature at the nearest bathroom tap
°CGas leak test
- Pass
- Fail
- Not a gas unit
Leak found and what was done (only if "Gas leak test" is Fail)
Flue checked and clear (gas units)
- Yes
- No
- N/A
Old unit removed and disposed of
- Yes
- No
- N/A
With the customer
- Shown how it works and where the isolation valve is
- Warranty registered, or the card left with them
- Manuals left with them
Photos of the installation and the data plate
- Photos taken
Plumber
NameSignatureDateLicence number
Customer
NameSignatureDateA starting point only. Check it against your state or territory rules and your own safety system before you use it. It is not legal or compliance advice.