Air conditioner commissioning sheet
Use your browser's Print to print it or save it as a PDF. Back to the template
System type
- Split system
- Multi-head split
- Ducted
- Other
Indoor unit, make, model and serial
Outdoor unit, make, model and serial
Refrigerant type
Refrigerant added
kgPressure test held at
kPaPressure held for
minutesVacuum reached
micronsLeak check
- Pass
- Fail
Leak found and what was done (only if "Leak check" is Fail)
Electrical
- Isolator fitted at the outdoor unit
- Connections and terminations checked
- Supply voltage checked
Running current
ARun on test in
- Cooling
- Heating
Supply air temperature
°CReturn air temperature
°CCondensate drain tested and flowing
- Yes
- No
- N/A
With the customer
- Shown the remote and the modes
- Shown how to clean the filters
- Manuals and warranty left with them
Photos of the indoor and outdoor units
- Photos taken
Technician
NameSignatureDateLicence number
Customer
NameSignatureDateA starting point only. Check it against your state or territory rules and your own safety system before you use it. It is not legal or compliance advice.